Review permits, drawings, lift information, and prior repair records
Keep the waterfront record package current so a future repair does not begin with a records hunt.

Charleston waterfront ownership
A simple seasonal rhythm for noticing dock, lift, shoreline, record, and storm-readiness problems before they become emergency projects.
Use it this way: Use this as a reminder system, not a substitute for manufacturer schedules, inspections, or engineering advice. A visible change or major storm should override the calendar.
Storm prep checklist →Winter · January–February
Use a low-activity part of the year to make sure you know what you own and what needs professional attention before spring projects begin.
Keep the waterfront record package current so a future repair does not begin with a records hunt.
Look for obvious damage, movement, missing hardware, loose boards, corrosion, or other changes. Do not climb onto anything that appears unsafe.
Look for new soil loss, settlement, wall movement, end erosion, drainage changes, or exposed areas that were not present before.
Spring · March–May
Spring is a useful planning window for repairs, lift service, electrical review, and permit research before peak summer use.
Have the appropriate pro review cables, motors, controls, bunks, beams, pilings, and operating condition based on the lift manufacturer's/service guidance.
Damaged, corroded, wet, or improvised waterfront electrical equipment should be evaluated by a qualified electrical professional.
Docks, lifts, shoreline work, and other coastal alterations can require state, federal, local, or private approvals. Identify the permit lane before ordering work.
SCDES Critical Area Permitting ↗Summer · June–August
Regular use makes small changes easier to notice. Hurricane season also makes documentation and loose-item control more important.
Use changes as a prompt for repair or evaluation rather than waiting for a larger failure.
A current pre-storm photo record makes later damage easier to explain to contractors, insurers, engineers, and permitting agencies.
Know what loose items need removal, where records/photos are stored, and whose manufacturer/installer guidance applies to the lift or dock equipment.
Fall · September–November
After high-use and high-weather months, compare condition rather than relying on memory.
Look for new movement, wear, corrosion, damaged hardware, piling changes, or equipment problems that should enter the winter repair queue.
Look for new voids, settlement, leaning walls, displaced stone, drainage changes, or washouts. Use a professional when the cause or stability is unclear.
Keep the property record current for insurance, resale, maintenance, and future permitting decisions.
Any time
A major storm, collision, visible movement, electrical event, or sudden erosion change matters more than the month.
Stay off anything that moved, sagged, cracked, flooded, or may have electrical damage until the hazard is understood.
Photos, dates, and a short description make it easier to compare condition and explain the problem to the right professional.
When the checklist surfaces a real project
Send Shoreline a description, photo, or short video. We can help organize the issue before you decide which kind of pro needs to see it.
Tell Shoreline what I need →Primary sources
Sources reviewed September 13, 2026. Requirements can change and site-specific decisions belong to the responsible agency or qualified professional.