Inspect from land before walking onto any waterfront structure
Stay off structures with new leaning, sagging, twisting, broken framing, displaced pilings, moved floats/ramps, missing rails, washout, or uncertain stability.

Charleston storm recovery
Start with safety, document what changed, separate the damage into the right project lanes, and check current authorization before rebuilding coastal structures.
Use it this way: Use this after officials say it is safe to return. If a structure, shoreline, floodwater, or electrical system looks unsafe, stop there and bring in the appropriate professional.
Full storm damage guide →First look
A dock can still be standing and still be unsafe. Start from stable ground and separate immediate hazards from property documentation.
Stay off structures with new leaning, sagging, twisting, broken framing, displaced pilings, moved floats/ramps, missing rails, washout, or uncertain stability.
Do not touch or energize damaged lift, dock, or shore-power equipment until the appropriate qualified professional has evaluated it.
Do not enter water or damaged shoreline areas to retrieve debris or inspect structures.
Document
Once it is safe, create a record before damaged material is moved or repaired.
Capture the relationship between the house/yard, shoreline, dock, lift, wall, debris, and water.
Document broken framing, displaced pilings, lift damage, erosion, wall movement, water/debris lines, and equipment labels when safe.
Separate new storm damage from pre-existing condition so the scope is easier to explain.
Maintain one folder for insurance, contractor, engineering, and permit follow-up.
Triage
One storm can create several different jobs. Do not ask one contractor to diagnose everything by default.
Note movement, broken members, lost sections, damaged connections, and whether the structure still resembles the permitted configuration.
Lift equipment, support structure, and electrical systems may need different professionals even when the damage happened in the same event.
Look for new soil loss, voids, settlement, leaning, displaced stone, end erosion, or channels cut by water.
Report and permit building damage through the appropriate local process rather than assuming a coastal-structure authorization covers the house.
Before repair
Storm damage does not automatically authorize reconstruction. The correct path depends on what existed, what was permitted, and what you want to put back.
The prior authorization can determine whether work is maintenance, reconstruction under a general permit, an amendment, or another permit path.
Emergency General Permits are event-specific. When available, SCDES says individual coverage is still required and restoration is limited to the previously permitted/grandfathered size, configuration, and location.
SCDES Emergency General Permits ↗Qualifying previously permitted private recreational docks may fit GP-25-DR; qualifying non-oceanfront erosion-control structures may fit GP-25-ECS. Other work may require another permit route.
SCDES General Permits ↗An SCDES authorization does not automatically satisfy every other agency or private requirement.
When the checklist surfaces a real project
Send Shoreline the safe-to-capture photos and a description. We can structure dock, lift, shoreline, electrical, and permit questions before matching the project.
Tell Shoreline what I need →Primary sources
Sources reviewed September 13, 2026. Requirements can change and site-specific decisions belong to the responsible agency or qualified professional.