Confirm they regularly perform this exact kind of work
Ask about the actual project lane—dock repair, new dock, boat lift, bulkhead, living shoreline, pile work, marine electrical, or another specialty—not just whether they do “marine construction.”

Free Charleston waterfront tool
Use the same questions whether a pro came from Shoreline, a neighbor, your Realtor, or somewhere else. Fit, evidence, scope clarity, and execution matter more than a generic star rating.
Use it this way: Use this after you know the kind of pro you need. It is designed to expose mismatches and unanswered questions before a proposal becomes a project.
Browse evidence-backed profiles →Fit first
A strong contractor can still be a poor fit for a particular waterfront project. Start with service, geography, project type, and permitting experience.
Ask about the actual project lane—dock repair, new dock, boat lift, bulkhead, living shoreline, pile work, marine electrical, or another specialty—not just whether they do “marine construction.”
Local permitting and site conditions matter. Ask whether they routinely work in the property's city/town/county and on similar creeks, rivers, or marsh-front sites.
Ask whether the contractor wants this type and size of job now. Fit matters more than forcing a contractor into a project they usually avoid.
Some contractors manage permit coordination; others expect an owner, surveyor, engineer, or permit agent to do it. Make that responsibility explicit before signing.
Verify
Licensing requirements vary by scope. Verify what is actually required for the proposed work rather than assuming every marine project uses the same license.
Use South Carolina LLR and the local jurisdiction to verify the license classification required for the work and the contractor's current status.
SC Contractor’s Licensing Board ↗For City of Charleston work, the City notes that contractor license requirements vary with project scope and that local business licensing can also apply.
City of Charleston Permit Center ↗Past permit associations, public portfolio work, and similar completed projects can show activity, but none alone proves quality. Use them as evidence to ask better questions.
A seawall reference is more useful for a seawall than a generic remodeling reference. Ask about communication, change orders, schedule, cleanup, and permit coordination.
Scope & money
Most project friction is easier to prevent before work starts than after a change appears in the field.
The proposal should distinguish demolition, materials, dimensions, electrical, engineering, permitting, disposal, access, restoration, and exclusions where they matter.
Ask which prices depend on hidden conditions, material choices, engineering, access, subsurface conditions, or agency requirements.
Changes should be documented before extra work proceeds when practical. Ask who can authorize a change and how cost/schedule impact will be shown.
Tie payments to a written agreement and clear project milestones. Avoid relying on verbal promises about what a deposit or progress payment covers.
Execution
The company you hire and the people who show up can be different layers of the same project.
Get the name and preferred communication method for the person who will answer questions once work begins.
For engineering, surveying, pile work, electrical, or specialty tasks, understand who is responsible for bringing in the qualified trade and coordinating inspections.
Permits, weather, tides, materials, engineering, inspections, and access can all affect waterfront schedules. Ask which dependencies are already known.
For larger projects, ask for final permits/approvals, warranties, product information, inspection records, and any maintenance instructions that should stay with the property.
When the checklist surfaces a real project
Describe the project once. Shoreline can structure the details and apply service, geography, project-type, and contractor-fit rules without forcing you into a multi-quote funnel.
Tell Shoreline what I need →Primary sources
Sources reviewed September 13, 2026. Requirements can change and site-specific decisions belong to the responsible agency or qualified professional.