Charleston waterfront planning tool
Boat Lift Planner
Start with the boat, the existing dock, and the permit context. The planner routes the project as repair, replacement, new installation, or broader dock-and-lift work without guessing an engineering capacity.
Deterministic project routingNo account requiredNo “AI capacity” guess
Important: Lift capacity, piling design, electrical work, and structural suitability require the appropriate manufacturer/installer/engineer/trade judgment. Shoreline uses your answers to organize the project, not engineer it.
Read the full boat-lift guide →Primary sources
The permit flags come from current coastal guidance.
SCDESCritical Area FAQBoat-lift additions, dock eligibility, creek-width guidance, and overlapping approvalsSCDESMinor ActivitiesPrivate docks, living shorelines, erosion-control structures, and additions to existing docksSCDESGeneral PermitsDefined expedited lanes for qualifying existing-dock additions and reconstruction work
Sources reviewed September 13, 2026. Site-specific permit treatment and equipment selection require the responsible agency or qualified professional.
