Take safe photos of the full shoreline and problem areas
Include wide views plus close views of leaning, cracks, gaps, washout, settlement, soil loss, drainage outlets, end erosion, or displaced material.

Shoreline project readiness
The visible wall may not be the whole problem. Document what the shoreline is doing, what is at risk, and what has already been permitted before locking into a construction solution.
Use it this way: Use the checklist to separate the observed problem from the proposed solution. That makes it easier to know whether the first call should be a marine contractor, engineer, surveyor, shoreline specialist, or permitting professional.
Living shoreline vs. seawall →Problem
Start with the failure pattern instead of assuming the answer is automatically a new wall.
Include wide views plus close views of leaning, cracks, gaps, washout, settlement, soil loss, drainage outlets, end erosion, or displaced material.
Note whether it followed a storm, high-water event, drainage change, neighboring work, or has progressed slowly over time.
House, pool, road, utilities, septic, landscaping, dock access, and property lines can change urgency and design constraints.
Old permits, drawings, invoices, repairs, surveys, and photos help a professional understand what exists and what was previously authorized.
Solution
The useful question is what stabilization approach fits the site and problem—not merely who can replace the visible structure fastest.
A credible proposal should connect the recommended work to the observed problem rather than only quote a structure.
Living shorelines are encouraged by SCDES in suitable estuarine settings, but eligibility and design are site-specific.
SCDES Living Shorelines ↗Some erosion-control and living-shoreline projects require a current Department-certified Critical Area Line before permitting or design can proceed.
Shoreline projects can require more than a construction contractor. Make professional roles explicit before comparing proposals.
Proposal
Ask every serious bidder to be explicit about limits, unknowns, and responsibility.
New work, maintenance, and qualifying same-size reconstruction can follow different SCDES paths. The agency makes the final determination.
SCDES Critical Area Permitting ↗Know where the work starts/ends, how it meets neighboring or existing structures, and whether drainage or upland restoration is included.
The proposal should identify the system being priced and material assumptions clearly enough to compare competing bids.
A shoreline price can look very different depending on what happens to disturbed upland areas and removed material.
When the checklist surfaces a real project
Upload photos or describe what is changing. Shoreline can structure the project lane and surface the right type of professional.
Tell Shoreline what I need →Primary sources
Sources reviewed September 13, 2026. Requirements can change and site-specific decisions belong to the responsible agency or qualified professional.